{"id":1022,"date":"2026-07-19T09:00:00","date_gmt":"2026-07-19T01:00:00","guid":{"rendered":"https:\/\/borrapumps.com\/blog\/jockey-pump-sensing-line-diagram\/"},"modified":"2026-07-19T09:00:00","modified_gmt":"2026-07-19T01:00:00","slug":"jockey-pump-sensing-line-diagram","status":"publish","type":"post","link":"https:\/\/borrapumps.com\/ru\/blog\/jockey-pump-sensing-line-diagram\/","title":{"rendered":"Jockey Pump Sensing Line: Drawing and Review Checks"},"content":{"rendered":"<div class=\"b2b-article\">\n<h2>Direct Answer<\/h2>\n<p><strong>A jockey pump sensing line tells the controller what system pressure it is monitoring.<\/strong> This guide helps contractors and project teams review a drawing or test plan without treating a generic article as an approval document.<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/borrapumps.com\/wp-content\/uploads\/2026\/05\/EDJ-Integrated-Fire-Pump-Set-For-Fire-Fighting.webp\" alt=\"BORRAPUMP integrated fire pump package\" loading=\"lazy\"><\/p>\n<h2>1. Start With the Project Drawing<\/h2>\n<p>Use the approved project drawing to identify water source, main fire pump, jockey branch, controller, valves, and test path. A supplier layout defines package scope; it does not replace the engineer&#8217;s system drawing.<\/p>\n<table>\n<thead>\n<tr>\n<th>Review item<\/th>\n<th>What to confirm<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Pressure reference<\/td>\n<td>The intended system point is clear.<\/td>\n<\/tr>\n<tr>\n<td>Controller input<\/td>\n<td>Signal matches the project sequence.<\/td>\n<\/tr>\n<tr>\n<td>Isolation and test access<\/td>\n<td>Maintenance path is defined.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2>2. Check the Main and Jockey Duties<\/h2>\n<p>The main pump serves required fire-flow duty. The jockey pump maintains pressure against small losses and should not be treated as the main fire-flow machine.<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/borrapumps.com\/wp-content\/uploads\/2026\/05\/CDLF-Vertical-Multistage-Jockey-Pump.webp\" alt=\"BORRAPUMP vertical multistage jockey pump\" loading=\"lazy\"><\/p>\n<h2>3. Review Controller Signals<\/h2>\n<p>Verify the pressure reference, controller connection, and intended start sequence against the project documents. Exact setpoints are project-specific and must not be inferred from a generic drawing.<\/p>\n<table>\n<thead>\n<tr>\n<th>Signal<\/th>\n<th>Review boundary<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Minor pressure decay<\/td>\n<td>Jockey response is reviewed first.<\/td>\n<\/tr>\n<tr>\n<td>Continued pressure drop<\/td>\n<td>Main fire-pump sequence follows project documents.<\/td>\n<\/tr>\n<tr>\n<td>Test condition<\/td>\n<td>Use documented procedure and records.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2>4. Confirm Test and Drain Paths<\/h2>\n<p>The layout should show test points, drain paths, gauges, and isolation needed for the project procedure. Do not omit site safety and authority requirements.<\/p>\n<h2>5. Review Package Supply Scope<\/h2>\n<p>List supplied pumps, drivers, controllers, valves, instruments, documents, and field connections. This avoids treating a package quotation as a complete site installation.<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/borrapumps.com\/wp-content\/uploads\/2026\/05\/XBC-W-End-Suction-Type-Diesel-Engine-Fire-Pump.webp\" alt=\"BORRAPUMP diesel fire pump for package review\" loading=\"lazy\"><\/p>\n<h2>6. RFQ and Documentation Checklist<\/h2>\n<table>\n<thead>\n<tr>\n<th>Information<\/th>\n<th>Purpose<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Required flow and pressure<\/td>\n<td>Defines fire-pump duty.<\/td>\n<\/tr>\n<tr>\n<td>Water source<\/td>\n<td>Defines suction interface.<\/td>\n<\/tr>\n<tr>\n<td>Controller requirement<\/td>\n<td>Defines signals and scope.<\/td>\n<\/tr>\n<tr>\n<td>Requested documents<\/td>\n<td>Defines commercial boundary.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>For fire pump package discussion, send verified project data through <a href=\"https:\/\/borrapumps.com\/ru\/contact-us\/\">contact Borra<\/a>.<\/p>\n<h2>7. Fit Boundary<\/h2>\n<p>This guide does not certify a fire-protection system or claim UL, FM, NFPA, or local approval. Final acceptance requires the applicable project documents, authorities, and verified product evidence.<\/p>\n<h2>FAQ<\/h2>\n<h3>Can a supplier drawing replace the engineer drawing?<\/h3>\n<p>No. It explains package scope but not the accepted project system.<\/p>\n<h3>What does a jockey pump sensing line do?<\/h3>\n<p>It provides the controller with the pressure reference for its maintenance duty.<\/p>\n<h3>What should testing records include?<\/h3>\n<p>Use the project procedure, controller documentation, and required authority records.<\/p>\n<h3>Is the jockey pump the main fire-flow pump?<\/h3>\n<p>No. It maintains pressure for small losses.<\/p>\n<h3>Can this guide approve a package?<\/h3>\n<p>No. Approval requires project-specific review.<\/p>\n<h3>What should be sent for quotation?<\/h3>\n<p>Send flow, pressure, source, driver, controller, connections, documents, and destination.<\/p>\n<h2>References<\/h2>\n<ul>\n<li><a href=\"https:\/\/www.nfpa.org\/\" target=\"_blank\" rel=\"noopener\">NFPA fire pump resources<\/a><\/li>\n<li><a href=\"https:\/\/www.pumps.org\/\" target=\"_blank\" rel=\"noopener\">Hydraulic Institute<\/a><\/li>\n<li><a href=\"https:\/\/www.pumpsandsystems.com\/\" target=\"_blank\" rel=\"noopener\">Pumps &amp; Systems<\/a><\/li>\n<\/ul>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Direct Answer A jockey pump sensing line tells the controller what system pressure it is monitoring. This guide helps contractors and project teams review a drawing or test plan without treating a generic article as an approval document. 1. Start With the Project Drawing Use the approved project drawing to identify water source, main fire [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":167,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[26],"tags":[],"class_list":["post-1022","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-fire-pump"],"_links":{"self":[{"href":"https:\/\/borrapumps.com\/ru\/wp-json\/wp\/v2\/posts\/1022","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/borrapumps.com\/ru\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/borrapumps.com\/ru\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/borrapumps.com\/ru\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/borrapumps.com\/ru\/wp-json\/wp\/v2\/comments?post=1022"}],"version-history":[{"count":0,"href":"https:\/\/borrapumps.com\/ru\/wp-json\/wp\/v2\/posts\/1022\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/borrapumps.com\/ru\/wp-json\/wp\/v2\/media\/167"}],"wp:attachment":[{"href":"https:\/\/borrapumps.com\/ru\/wp-json\/wp\/v2\/media?parent=1022"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/borrapumps.com\/ru\/wp-json\/wp\/v2\/categories?post=1022"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/borrapumps.com\/ru\/wp-json\/wp\/v2\/tags?post=1022"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}