{"id":1148,"date":"2026-08-09T09:00:00","date_gmt":"2026-08-09T01:00:00","guid":{"rendered":"https:\/\/borrapumps.com\/blog\/fire-pump-jockey-pump-diagram\/"},"modified":"2026-08-12T21:04:19","modified_gmt":"2026-08-12T13:04:19","slug":"fire-pump-jockey-pump-diagram","status":"publish","type":"post","link":"https:\/\/borrapumps.com\/ru\/blog\/fire-pump-jockey-pump-diagram\/","title":{"rendered":"What Should a Fire Pump and Jockey Pump Diagram Separate?"},"content":{"rendered":"<div class=\"b2b-article\">\n<p style=\"margin:0 0 16px;line-height:1.7\"><strong>A fire pump and jockey pump diagram should separate the main fire-flow duty from pressure-maintenance duty, then show the water path, controls interfaces, and project records that must be confirmed for the actual system.<\/strong> The diagram is a review tool; it does not certify, approve, size, or set a fire-protection system.<\/p>\n<figure style=\"margin:26px 0;text-align:center\"><img decoding=\"async\" style=\"max-width:640px;width:100%;height:auto;display:block;margin:0 auto;border-radius:8px\" alt=\"BORRAPUMP EDJ integrated fire pump set shown as a package route requiring project-specific documentation\" src=\"https:\/\/borrapumps.com\/wp-content\/uploads\/2026\/05\/EDJ-Integrated-Fire-Pump-Set-For-Fire-Fighting.webp\" \/><\/figure>\n<nav class=\"b2b-toc\" style=\"background:#f5f8fa;padding:16px 20px;border-radius:8px;margin:0 0 24px\">\n<h2 id=\"contents\" style=\"margin:42px 0 14px;scroll-margin-top:96px\">Contents<\/h2>\n<ul style=\"margin:0 0 18px 1.2em;line-height:1.7\">\n<li style=\"margin:0 0 8px\"><a href=\"#part-1-start-by-separating-the-two-duties\">Part 1. Start by Separating the Two Duties<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#part-2-read-the-main-fire-flow-path\">Part 2. Read the Main Fire-Flow Path<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#part-3-read-the-pressure-maintenance-path\">Part 3. Read the Pressure-Maintenance Path<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#part-4-mark-controls-and-project-records-for-review\">Part 4. Mark Controls and Project Records for Review<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#part-5-turn-the-diagram-into-a-controlled-inquiry\">Part 5. Turn the Diagram Into a Controlled Inquiry<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#part-6-define-what-this-fire-system-diagram-cannot-establish\">Part 6. Define What This Fire-System Diagram Cannot Establish<\/a><\/li>\n<\/ul>\n<\/nav>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"part-1-start-by-separating-the-two-duties\">Part 1. Start by Separating the Two Duties<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">A clear diagram prevents one pump from being described as doing every job. The main fire-pump route is reviewed for the system\u2019s fire-flow function, while the jockey-pump route is reviewed for pressure maintenance. The <a href=\"https:\/\/borrapumps.com\/ru\/%d0%b1%d0%bb%d0%be%d0%b3\/%d0%bf%d0%be%d0%b6%d0%b0%d1%80%d0%bd%d1%8b%d0%b9-%d0%bd%d0%b0%d1%81%d0%be%d1%81\/\">BORRAPUMP Fire Pump guide<\/a> provides related cluster context, but the actual project record must state the system objective and the documents that govern it.<\/p>\n<table style=\"width:100%;border-collapse:collapse\">\n<thead>\n<tr>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Diagram area<\/th>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Function to distinguish<\/th>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Review question<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Main pump route<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Fire-flow duty<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Is this route clearly separated from pressure maintenance?<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Jockey-pump route<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Pressure-maintenance duty<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Is it identified as a different function?<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Water source and discharge<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">System water path<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Are the endpoints and route documented?<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Controls interface<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Responsibility and signal relationship<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Are the project control records identified?<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"part-2-read-the-main-fire-flow-path\">Part 2. Read the Main Fire-Flow Path<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">Follow the diagram from water source through the main pump path to the system discharge. Mark the source condition, suction route, pump location, discharge route, and the document references that define the system. A general diagram should expose unknowns rather than invent a pump rating, pressure, flow, or configuration.<\/p>\n<table style=\"width:100%;border-collapse:collapse\">\n<thead>\n<tr>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Mark on the diagram<\/th>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">\u041f\u043e\u0447\u0435\u043c\u0443 \u044d\u0442\u043e \u0432\u0430\u0436\u043d\u043e<\/th>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Must be confirmed<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Water source<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Establishes the start of the system path<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Actual source conditions<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Suction and discharge route<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Makes the physical route reviewable<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Project routing and components<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Main pump location<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Identifies the fire-flow function<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Exact product and arrangement<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">System demand interface<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Shows where the system receives water<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Project demand documentation<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p style=\"margin:0 0 16px;line-height:1.7\">\u042d\u0442\u043e\u0442 <a href=\"https:\/\/borrapumps.com\/ru\/%d0%b1%d0%bb%d0%be%d0%b3\/fire-pump-system-diagram\/\">Fire Pump System Diagram<\/a> covers broader system components. It also should not be used as proof that an unreviewed project meets any standard.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"part-3-read-the-pressure-maintenance-path\">Part 3. Read the Pressure-Maintenance Path<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">The jockey-pump path should be drawn as a pressure-maintenance function, not as a replacement for the main fire-flow route. Identify where the path connects to the system, how it is represented in the project record, and which actual control documentation applies. Do not add pressure settings or automatic-sequence claims to a generic layout.<\/p>\n<figure style=\"margin:26px 0;text-align:center\"><img decoding=\"async\" style=\"max-width:640px;width:100%;height:auto;display:block;margin:0 auto;border-radius:8px\" alt=\"BORRAPUMP XBC diesel engine fire pump shown as a main-pump route distinct from a jockey-pump pressure-maintenance discussion\" src=\"https:\/\/borrapumps.com\/wp-content\/uploads\/2026\/07\/how-to-choose-a-diesel-fire-pump-cover-scene.webp\" \/><\/figure>\n<table style=\"width:100%;border-collapse:collapse\">\n<thead>\n<tr>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Pressure-maintenance review item<\/th>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">What the diagram can show<\/th>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">What it cannot establish<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Jockey-pump identity<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">A distinct role in the layout<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Actual model performance<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Connection point<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Relationship to the system path<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Pressure settings or sequence<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Control interface<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Need for control documentation<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Wiring or alarm values<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Service access<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Location for inspection planning<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">A test result or approval<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p style=\"margin:0 0 16px;line-height:1.7\">\u0418\u0441\u043f\u043e\u043b\u044c\u0437\u043e\u0432\u0430\u0442\u044c <a href=\"https:\/\/borrapumps.com\/ru\/%d0%b1%d0%bb%d0%be%d0%b3\/fire-pump-jockey-pump-piping-diagram\/\">\u0427\u0442\u043e \u043d\u0443\u0436\u043d\u043e \u0440\u0430\u0437\u0434\u0435\u043b\u0438\u0442\u044c \u043d\u0430 \u0441\u0445\u0435\u043c\u0435?<\/a> for related piping-detail context. Keep all actual settings in the responsible project documents and product instructions.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"part-4-mark-controls-and-project-records-for-review\">Part 4. Mark Controls and Project Records for Review<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">The diagram should name the points where a project needs document review: controller interface, responsible roles, available drawings, product data, inspection records, and handover expectations. It is not a wiring sheet and should not be treated as an instruction to energize, test, or change controls.<\/p>\n<table style=\"width:100%;border-collapse:collapse\">\n<thead>\n<tr>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Review record<\/th>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Why it belongs with the diagram<\/th>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Boundary<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Current system drawing<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Aligns the layout with the project scope<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Generic blog art is not a drawing set<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Product documentation<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Connects labels to actual equipment<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Family names do not prove suitability<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Control documentation<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Establishes responsibility and interfaces<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">No wiring or setting inference<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Inspection or handover plan<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Identifies required project evidence<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Not a result or acceptance claim<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<blockquote>\n<p style=\"margin:0 0 16px;line-height:1.7\"><strong>Important:<\/strong> Do not use a public diagram as evidence of NFPA, UL, FM, code approval, certification, or compliance. Public <a href=\"https:\/\/www.nfpa.org\/\" target=\"_blank\" rel=\"noopener\">NFPA resources<\/a> explain standards context, while the actual project must use its responsible documents and approvals.<\/p>\n<\/blockquote>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"part-5-turn-the-diagram-into-a-controlled-inquiry\">Part 5. Turn the Diagram Into a Controlled Inquiry<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">Attach the marked diagram to a controlled inquiry only after the project has stated the water source, duty objective, system route, installation location, document needs, and destination. That creates a factual discussion path without asking a supplier to infer the system from a keyword.<\/p>\n<figure style=\"margin:26px 0;text-align:center\"><img decoding=\"async\" style=\"max-width:640px;width:100%;height:auto;display:block;margin:0 auto;border-radius:8px\" alt=\"BORRAPUMP CDL(F) vertical multistage jockey pump shown as a pressure-maintenance component requiring documented project conditions\" src=\"https:\/\/borrapumps.com\/wp-content\/uploads\/2026\/05\/CDLF-Vertical-Multistage-Jockey-Pump.webp\" \/><\/figure>\n<table style=\"width:100%;border-collapse:collapse\">\n<thead>\n<tr>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Documented discussion<\/th>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">BORRAPUMP route<\/th>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Send with quote<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Integrated package review<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\"><a href=\"https:\/\/borrapumps.com\/ru\/product\/edj-integrated-fire-pump-set\/\">EDJ Integrated Fire Pump Set<\/a><\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">System objective, source, layout, duty basis, power\/driver context, documents, destination<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Main-pump inquiry<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\"><a href=\"https:\/\/borrapumps.com\/ru\/product\/xbc-diesel-engine-fire-pump\/\">XBC Diesel Engine Fire Pump<\/a><\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Source, route, duty basis, installation location, documents, destination<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Pressure-maintenance discussion<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\"><a href=\"https:\/\/borrapumps.com\/ru\/product\/cdlf-vertical-multistage-jockey-pump\/\">CDL(F) \u0412\u0435\u0440\u0442\u0438\u043a\u0430\u043b\u044c\u043d\u044b\u0439 \u043c\u043d\u043e\u0433\u043e\u0441\u0442\u0443\u043f\u0435\u043d\u0447\u0430\u0442\u044b\u0439 \u043f\u043e\u0434\u043a\u0430\u0447\u0438\u0432\u0430\u044e\u0449\u0438\u0439 \u043d\u0430\u0441\u043e\u0441<\/a><\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">System context, pressure-maintenance objective, layout, controls documents, destination<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p style=\"margin:0 0 16px;line-height:1.7\">Share the controlled record with <a href=\"https:\/\/borrapumps.com\/ru\/contact-us\/\">\u0411\u041e\u0420\u0420\u0410\u041f\u0410\u041c\u041f<\/a> for a project-specific discussion. No product route above is a compliance, configuration, or approval statement.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"part-6-define-what-this-fire-system-diagram-cannot-establish\">Part 6. Define What This Fire-System Diagram Cannot Establish<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">Fits:<\/p>\n<ul style=\"margin:0 0 18px 1.2em;line-height:1.7\">\n<li style=\"margin:0 0 8px\">Showing that fire-flow and pressure-maintenance duties are separate in a project review.<\/li>\n<li style=\"margin:0 0 8px\">Identifying the water path, controls interfaces, and documents that need confirmation.<\/li>\n<\/ul>\n<p style=\"margin:0 0 16px;line-height:1.7\">Does not fit:<\/p>\n<ul style=\"margin:0 0 18px 1.2em;line-height:1.7\">\n<li style=\"margin:0 0 8px\">Establishing NFPA, UL, FM, certification, approval, or compliance status.<\/li>\n<li style=\"margin:0 0 8px\">Providing flow, pressure, control settings, wiring, testing, or acceptance instructions.<\/li>\n<li style=\"margin:0 0 8px\">Selecting a product without actual system and project documentation.<\/li>\n<\/ul>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"faq\">\u0427\u0430\u0441\u0442\u043e \u0437\u0430\u0434\u0430\u0432\u0430\u0435\u043c\u044b\u0435 \u0432\u043e\u043f\u0440\u043e\u0441\u044b<\/h2>\n<h3 style=\"margin:28px 0 12px\">What does a fire pump and jockey pump diagram show?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">It shows the high-level relationship between the main fire-flow route, the pressure-maintenance route, the water path, control interfaces, and project records. The actual drawing set and product documents provide project-specific detail.<\/p>\n<h3 style=\"margin:28px 0 12px\">Is a jockey pump the main fire-flow pump?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">No. In a system review, the jockey pump is identified with a pressure-maintenance role, while the main pump route is identified with the fire-flow function. Confirm the actual arrangement through project documentation.<\/p>\n<h3 style=\"margin:28px 0 12px\">Does the diagram prove a code-compliant system?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">No. A generic diagram cannot prove certification, approval, or compliance. Those matters depend on the responsible project documents, product evidence, and applicable authority review.<\/p>\n<h3 style=\"margin:28px 0 12px\">What should be marked on the flow route?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">Mark the water source, suction and discharge route, main pump location, system demand interface, installation location, and document references. Record unknowns rather than filling them with assumptions.<\/p>\n<h3 style=\"margin:28px 0 12px\">What records should be sent for review?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">Send the current layout, stated system objective, source and route information, duty basis, installation context, product-document needs, control interfaces, quantity, and destination.<\/p>\n<h3 style=\"margin:28px 0 12px\">Can this article set pressure or control values?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">No. It provides no settings, wiring, or control sequence. Use actual product instructions and the responsible project documentation.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"references\">References<\/h2>\n<ul style=\"margin:0 0 18px 1.2em;line-height:1.7\">\n<li style=\"margin:0 0 8px\"><a href=\"https:\/\/www.nfpa.org\/\" target=\"_blank\" rel=\"noopener\">NFPA public resources<\/a> for standards context; not product or project approval evidence.<\/li>\n<\/ul>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>A fire pump and jockey pump diagram should separate the main fire-flow duty from pressure-maintenance duty, then show the water path, controls interfaces, and project records that must be confirmed for the actual system. The diagram is a review tool; it does not certify, approve, size, or set a fire-protection system. Contents Part 1. Start [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":167,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[26],"tags":[],"class_list":["post-1148","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-fire-pump"],"_links":{"self":[{"href":"https:\/\/borrapumps.com\/ru\/wp-json\/wp\/v2\/posts\/1148","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/borrapumps.com\/ru\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/borrapumps.com\/ru\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/borrapumps.com\/ru\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/borrapumps.com\/ru\/wp-json\/wp\/v2\/comments?post=1148"}],"version-history":[{"count":1,"href":"https:\/\/borrapumps.com\/ru\/wp-json\/wp\/v2\/posts\/1148\/revisions"}],"predecessor-version":[{"id":1150,"href":"https:\/\/borrapumps.com\/ru\/wp-json\/wp\/v2\/posts\/1148\/revisions\/1150"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/borrapumps.com\/ru\/wp-json\/wp\/v2\/media\/167"}],"wp:attachment":[{"href":"https:\/\/borrapumps.com\/ru\/wp-json\/wp\/v2\/media?parent=1148"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/borrapumps.com\/ru\/wp-json\/wp\/v2\/categories?post=1148"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/borrapumps.com\/ru\/wp-json\/wp\/v2\/tags?post=1148"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}