ห้องข่าว

ข่าวสารและเรื่องราวโครงการ

อัปเดตล่าสุดจาก Borra ครอบคลุมการส่งมอบผลิตภัณฑ์ การประยุกต์ใช้ทางเทคนิค และเรื่องราวโครงการในฝั่งตลาด.

How to Prime a Water Transfer Pump Before Startup
ปั๊มโบรา

How to Prime a Water Transfer Pump Before Startup

A centrifugal transfer pump moves water, not air. If the casing and suction line hold air when the pump starts, the impeller spins without delivering, and in many designs the pump can damage itself while appearing to run. Contents Direct Answer 1. Why Priming Matters at Startup 2. Confirm the Priming Concept First 3. Pre-Fill […]

Portable Water Transfer Pump for Construction Sites
ปั๊มโบรา

Portable Water Transfer Pump for Construction Sites

Construction teams often need to relocate water between temporary tanks, sources, work fronts, and site processes. The first selection question is not the size of a portable frame. Contents Direct Answer 1. Define Transfer Duty Before Choosing Portability 2. Record Source, Destination, and Route Data 3. Review the Water and Intake Condition 4. Plan Power, […]

What Is a Water Transfer Pump? Types and Uses
ปั๊มโบรา

What Is a Water Transfer Pump? Types and Uses

Transfer duty means water needs to be somewhere else: from a source to storage, between tanks, from storage to a process, from a river or reservoir to an irrigation network. Delivery matters, and the pressure at the receiving end only needs to suit the route… Contents Direct Answer 1. Definition in Project Terms 2. Common […]

Sump Pump vs Drainage Pump: Site Selection Boundaries
ปั๊มโบรา

Sump Pump vs Drainage Pump: Site Selection Boundaries

A sump is a designed or existing low point where water collects. A sump pump is selected around that collection arrangement, including available space, inlet conditions, access, controls where fitted, and service retrieval. Contents Direct Answer 1. Separate the Collection Point From the Pump Label 2. Map the Water Path at the Site 3. Compare […]

Trash Pump vs Drainage Pump for Job Sites
ปั๊มโบรา

Trash Pump vs Drainage Pump for Job Sites

Job-site language sorts pumps into casual families: trash pumps for dirty water full of debris, drainage pumps for getting water out of the way. The labels are useful shorthand and terrible purchase criteria, because different manufacturers draw the lines… Contents Direct Answer 1. Naming Is Not a Specification 2. What Each Label Usually Emphasizes 3. […]

Dewatering Pump Discharge Hose: Layout and Outlet Checks
ปั๊มโบรา

Dewatering Pump Discharge Hose: Layout and Outlet Checks

A discharge hose is not a temporary detail that can be chosen after the pump arrives. It is the last part of the dewatering system and determines where water, silt, and any carried debris go. Contents Direct Answer 1. Treat the Hose as a Controlled Discharge Route 2. Record the Route Before Equipment Moves 3. […]

Construction Dewatering Pump Types and Selection
ปั๊มโบรา

Construction Dewatering Pump Types and Selection

Construction sites shop for dewatering pumps under time pressure, which tempts teams to start from a familiar product name. The reliable order is the reverse: write down what the site actually presents, then let the type follow. Contents Direct Answer 1. Start From Site Conditions, Not Pump Types 2. Common Pump Routes for Construction Dewatering […]

Drainage Pump Installation: Site Connection Checklist
ปั๊มโบรา

Drainage Pump Installation: Site Connection Checklist

Drainage work is frequently installed under schedule pressure, especially in excavations, pits, temporary works, and storm response. That makes connections and discharge routing easy to treat as temporary details. Contents Direct Answer 1. Confirm the Drainage Duty and Documented Water Path 2. Review Intake Position and Pump Placement 3. Trace the Discharge Connection to Its […]