pompe auto-amorçante — Self-priming pumps depend on sealed suction paths and proper priming water; most field issues trace to installation or maintenance rather than mysterious factory defects. This guide focuses on practical hydraulic sizing, application fit, and procurement documentation for export and U.S. project buyers. Where equipment selection is involved, cross-check public specifications on borrapumps.com and confirm project-specific limits with your consulting engineer or AHJ. Section checklists can be reused as RFQ attachments and commissioning handover outlines.

Part 1. Will Not Prime or Loses Prime
Air ingress at fittings, worn seals, or blocked foot valves prevents formation of the priming vacuum.
Inspect suction hose joints, check valve function, and confirm liquid level covers the suction opening.
Define design flow (GPM or m³/h) and total dynamic head before comparing catalogs—horsepower alone is not a sizing basis.
Review suction lift, water temperature, and entrained air; they affect NPSH margin and priming strategy.
Contrôle croisé related BORRA pump lines against your hydraulic calculation, not marketing peak points.
For export projects, confirm voltage, frequency, enclosure, and local listing expectations early in RFQ.
Request pump curves at the actual duty point—including NPSH data—not only catalog peak efficiency points.
Confirm suction piping, strainers, and priming method before finalizing self-priming versus submersible options.
Define who owns startup, training, and spare impeller or seal kits in the purchase order—not after shipment delays.
Compare quotations on a normalized basis: duty-point head/flow, materials, driver type, warranty, and commissioning scope.
For fire-related packages, coordinate hydraulic calculations with AHJ requirements before locking pump curves.
Retain pump curves, vibration baselines, and controller settings in the O&M file after turnover.
Before adding parallel capacity, verify suction piping, anchors, and electrical feeders can support the upgrade.
Part 3. Field Application and Installation Notes
On site, self priming pump selection should be validated against as-built piping, suction entry, and discharge routing—not only spreadsheet estimates.
Verify alignment, coupling guard, and anchor points before wet testing; misalignment accelerates seal and bearing wear.
For temporary dewatering, plan discharge permits, sediment control, and hose routing before mobilizing equipment.
Document startup sequence, alarm setpoints, and responsible operator contacts in the handover package.
When multiple pumps operate in parallel, confirm staging logic avoids short cycling at partial demand.
Export skids should include lifting points, nameplate photos, and spare seal kit part numbers in the O&M binder.
Parallel staging (duplex/triplex) improves redundancy when peak demand exceeds single-pump duty.
Variable speed control can reduce energy use when demand varies across shifts or occupancy.
Align control logic with utility or fire authority requirements before panel build.
Document test header, relief, and isolation valve locations on as-built drawings.
Request pump curves at the actual duty point—including NPSH data—not only catalog peak efficiency points.
Confirm suction piping, strainers, and priming method before finalizing self-priming versus submersible options.
Define who owns startup, training, and spare impeller or seal kits in the purchase order—not after shipment delays.
Compare quotations on a normalized basis: duty-point head/flow, materials, driver type, warranty, and commissioning scope.
For fire-related packages, coordinate hydraulic calculations with AHJ requirements before locking pump curves.
Retain pump curves, vibration baselines, and controller settings in the O&M file after turnover.
Before adding parallel capacity, verify suction piping, anchors, and electrical feeders can support the upgrade.
| Check item | Pourquoi c'est important | Typical owner |
|---|---|---|
| Duty-point run test | Confirms curve match | Commissioning agent |
| NPSH / priming check | Prevents cavitation | Mechanical contractor |
| Control alarm test | Ensures fault visibility | Electrical contractor |
| As-built P&ID update | Supports future retrofits | Owner O&M |

Partie 4. Liste de contrôle de la documentation et de la remise
L’acceptation industrielle ne doit pas se fonder uniquement sur l’énergie nécessaire pour la mise en marche – la documentation prouve les performances, la sécurité et la facilité d’entretien pour le prochain cycle de maintenance.
Use the tables below as a pump RFQ checklist—hydraulic duty, materials, and driver type should be explicit.
Pour les fiches techniques spécifiques aux produits, vérifiez la concordance related BORRA product pages and request missing test data.
When comparing quotations, normalize Incoterms, warranty scope, and included commissioning.
Include lift points, anchor details, and shipping Incoterms in export RFQs to avoid site surprises.
Clarify warranty response, spare parts lead time, and whether factory or local integrator performs startup.
Retain pump curves, vibration baselines, and controller settings in the O&M file after turnover.
Before adding parallel capacity, verify suction piping, anchors, and electrical feeders can support the upgrade.
| Document/élément | Objectif | Quand demander |
|---|---|---|
| Pump performance curve | Verify duty point, efficiency, and NPSH | Avant l'envoi de la commande |
| Factory test / hydrostatic report | Prove rated head and flow | Négociation du contrat |
| Installation manual + wiring diagram | Field assembly and controls | Phase de conception |
| Spare parts list (seals, impeller, bearings) | Lifecycle planning | Avant l’activation énergétique |
| Commissioning checklist | Acceptance at duty point | Before handover |
| Demande | Typical pump type | Key selection note |
|---|---|---|
| Building water boost | Vertical multistage / inline electric | Size on peak GPM and TDH; consider VFD staging |
| Protection contre l'incendie | Split-case, end suction, or vertical turbine | Match NFPA hydraulic demand and suction condition |
| Construction dewatering | Self-priming, submersible, or trailer diesel | Match solids content and portability |
| Municipal wastewater | Non-clog submersible or dry-pit | Confirm solids passage and rag handling |
Partie 5. Mise en service, surveillance et opérations à long terme
Commissioning should verify duty-point flow and head on the pump curve, not only motor rotation direction.
Functional tests include priming time, vibration checks, seal flush operation, and control alarm verification.
Log baseline pressure and flow after startup for future troubleshooting comparisons.
Train maintenance staff on lockout/tagout, impeller clearance checks, and bearing lubrication intervals.
Schedule periodic inspection of couplings, seals, and strainers—especially on dewatering and wastewater service.
Keep spare seal kits and critical impeller parts based on lead time, not catalog defaults alone.
Review driver maintenance separately—diesel engines need fuel, battery, and exhaust checks; motors need insulation and thermal history.
After major load changes, re-evaluate whether the original duty point still matches actual operating hours and flow profile.
Retain pump curves, vibration baselines, and controller settings in the O&M file after turnover.
Before adding parallel capacity, verify suction piping, anchors, and electrical feeders can support the upgrade.
Produits recommandés par BORRA
Pour obtenir de l'aide sur un projet, consultez notre related product line, solution options, et OEM/ODM capabilities sur borrapumps.com.

FAQ
Why won’t the pump prime?
Air ingress, insufficient priming liquid, or blocked suction prevents vacuum formation.
What causes loss of prime?
Leaking fittings, worn seals, or stuck check valves after shutdown.
How to find air leaks?
Pressurize or flood suction line and inspect joints, seals, and hose connections.
Is dry running harmful?
Yes—many designs rely on liquid in the casing for cooling and seal lubrication.
How much priming water?
Fill to manufacturer mark in casing or priming chamber before start.
When replace foot valve?
When check action fails or debris prevents sealing after cleaning.