Haber merkezi

Haberler ve Proje Hikayeleri

Borra'dan ürün teslimatı, teknik uygulamalar ve pazar tarafı proje hikayelerini kapsayan son güncellemeler.

Vertical Multistage Pump Selection for Building Pressure
Borra Pompaları

Vertical Multistage Pump Selection for Building Pressure

Buildings that cannot rely on the incoming supply to hold service pressure at every fixture add pressure-raising equipment, and vertical multistage pumps are one of the common machines applied to that duty. The vertical arrangement keeps the footprint small… Contents Direct Answer 1. Where Vertical Multistage Pumps Fit 2. Selection Inputs the Project Provides 3. […]

Sewage Pump Solids Handling: Project Selection Questions
Borra Pompaları

Sewage Pump Solids Handling: Project Selection Questions

The phrase sewage does not define one liquid. Start with the stream arriving at the pump: solid types, fibrous material, rags, grease, temperature range, chemistry, and how those conditions vary. Contents Direct Answer Part 1. Describe the Stream at the Pump Part 2. Ask What the Design Must Pass Part 3. Match the Installation Concept […]

Wastewater Pump Types for Industrial and Municipal Duty
Borra Pompaları

Wastewater Pump Types for Industrial and Municipal Duty

Wastewater is not one liquid. Municipal sewage, industrial process effluent, plant drainage, and sludge streams differ in solids, fibrous content, temperature, and chemistry, and those differences, not the word wastewater, decide which pump families are… Contents Direct Answer 1. Duty Definition Before Type Selection 2. Common Wastewater Pump Types 3. Solids and Liquid Characterization Questions […]

Su Transfer Pompası Sorun Giderme: Çalıştırma ve Akış Kontrolleri
Borra Pompaları

Su Transfer Pompası Sorun Giderme: Çalıştırma ve Akış Kontrolleri

Before a crew treats a no-flow or weak-flow complaint as a pump fault, it should confirm the intended operating state. Record the equipment tag, the operator's observation, the source condition, the valve lineup, and whether the unit was recently installed… Contents Direct Answer Part 1. Confirm the Startup Boundary Part 2. Check the Source and […]

How to Prime a Water Transfer Pump Before Startup
Borra Pompaları

How to Prime a Water Transfer Pump Before Startup

A centrifugal transfer pump moves water, not air. If the casing and suction line hold air when the pump starts, the impeller spins without delivering, and in many designs the pump can damage itself while appearing to run. Contents Direct Answer 1. Why Priming Matters at Startup 2. Confirm the Priming Concept First 3. Pre-Fill […]

Portable Water Transfer Pump for Construction Sites
Borra Pompaları

Portable Water Transfer Pump for Construction Sites

Construction teams often need to relocate water between temporary tanks, sources, work fronts, and site processes. The first selection question is not the size of a portable frame. Contents Direct Answer 1. Define Transfer Duty Before Choosing Portability 2. Record Source, Destination, and Route Data 3. Review the Water and Intake Condition 4. Plan Power, […]

What Is a Water Transfer Pump? Types and Uses
Borra Pompaları

What Is a Water Transfer Pump? Types and Uses

Transfer duty means water needs to be somewhere else: from a source to storage, between tanks, from storage to a process, from a river or reservoir to an irrigation network. Delivery matters, and the pressure at the receiving end only needs to suit the route… Contents Direct Answer 1. Definition in Project Terms 2. Common […]

Su Pompası vs. Kanalizasyon Pompası: Alan Seçimi Kısıtlamaları
Borra Pompaları

Su Pompası vs. Kanalizasyon Pompası: Alan Seçimi Kısıtlamaları

Bir su yığıntısı, suyun biriktirdiği tasarlanmış veya mevcut bir alandır. Bir su yığıntısı pompasının seçimi, mevcut alan, giriş koşulları, erişim, montajlı kontrol sistemleri ve servis alma gibi unsurları dikkate alarak sağlanır. İçindekiler Doğrudan Yanıt 1. Toplama Noktasını Pompanın Etiketinden Ayırın 2. Alanın Su Yolu Haritasını Oluşturun 3. Karşılaştırmayı Yapın […]