Set jockey pump pressure controls as a coordinated sequence derived from the approved system pressure and main fire pump start requirement. The jockey pump normally starts before the main fire pump as pressure falls and stops after restoring normal pressure. The main fire pump start point must remain low enough to avoid nuisance starts yet high enough to meet hydraulic and response requirements. There is no universal set of numbers: suction pressure, elevation, churn pressure, pressure regulation, sensing-line location, and device ratings all matter.
Безопасность и область применения: Пожарные насосы и их приводы относятся к оборудованию жизнеобеспечения. Работы с гидравлическими, электрическими, дизельными компонентами, топливом, аккумуляторами, под давлением, с вращающимся оборудованием, а также испытания и устранение неисправностей должны выполняться в соответствии с действующим утвержденным проектом, инструкциями производителя, применимыми стандартами и требованиями уполномоченного органа. Данное руководство описывает алгоритм принятия инженерных решений и не дает разрешения на внесение изменений на месте, обход защитных систем или эксплуатацию неквалифицированным персоналом.
Establish the pressure basis
Use the normal static pressure, source variation, pump curves, elevation, system ratings, and approved hydraulic minimums. Confirm which gauge location defines each setting. Treat this as a system condition rather than an isolated component choice. Identify the source of every input, the unit used, the operating condition it represents, and the person responsible for approval. If information is preliminary, mark the assumption and test how the decision changes at a conservative boundary. This prevents a neat calculation from hiding an uncertain water level, pressure, valve position, driver condition, or simultaneous demand.
For jockey pump pressure settings, verify this section against the selected pump curve, the actual site arrangement, manufacturer instructions, and the current requirements accepted by the authority having jurisdiction. Check the installed condition as well as the drawing because pipe routes, elevations, supports, controls, and access often change during construction. Record the result in a form that can be repeated during commissioning and later inspection. Do not change a safety-critical setting or isolate fire protection without the approved impairment and restoration process.
Arrange the start sequence
As pressure falls, the jockey pump should receive the first maintenance call. Continued pressure loss from a real demand must then initiate the main fire pump. The most useful evidence is measured or approved project data, not a copied rule of thumb. Identify the source of every input, the unit used, the operating condition it represents, and the person responsible for approval. If information is preliminary, mark the assumption and test how the decision changes at a conservative boundary. This prevents a neat calculation from hiding an uncertain water level, pressure, valve position, driver condition, or simultaneous demand.
For jockey pump pressure settings, verify this section against the selected pump curve, the actual site arrangement, manufacturer instructions, and the current requirements accepted by the authority having jurisdiction. Check the installed condition as well as the drawing because pipe routes, elevations, supports, controls, and access often change during construction. Record the result in a form that can be repeated during commissioning and later inspection. Do not change a safety-critical setting or isolate fire protection without the approved impairment and restoration process.
Set jockey stop pressure

Choose a stop point the jockey pump can reliably reach without excessive deadheading or exceeding system ratings. Check its shutoff head. Review this condition at normal, test, and credible abnormal states before procurement. Identify the source of every input, the unit used, the operating condition it represents, and the person responsible for approval. If information is preliminary, mark the assumption and test how the decision changes at a conservative boundary. This prevents a neat calculation from hiding an uncertain water level, pressure, valve position, driver condition, or simultaneous demand.
For jockey pump pressure settings, verify this section against the selected pump curve, the actual site arrangement, manufacturer instructions, and the current requirements accepted by the authority having jurisdiction. Check the installed condition as well as the drawing because pipe routes, elevations, supports, controls, and access often change during construction. Record the result in a form that can be repeated during commissioning and later inspection. Do not change a safety-critical setting or isolate fire protection without the approved impairment and restoration process.
Protect the main pump start point
Do not set it so low that required residual pressure is lost before starting, or so high that normal pressure variation starts the main pump. The design team should turn this point into a traceable calculation or drawing note. Identify the source of every input, the unit used, the operating condition it represents, and the person responsible for approval. If information is preliminary, mark the assumption and test how the decision changes at a conservative boundary. This prevents a neat calculation from hiding an uncertain water level, pressure, valve position, driver condition, or simultaneous demand.
For jockey pump pressure settings, verify this section against the selected pump curve, the actual site arrangement, manufacturer instructions, and the current requirements accepted by the authority having jurisdiction. Check the installed condition as well as the drawing because pipe routes, elevations, supports, controls, and access often change during construction. Record the result in a form that can be repeated during commissioning and later inspection. Do not change a safety-critical setting or isolate fire protection without the approved impairment and restoration process.
Практическая таблица решений
| Pressure event | Expected response | If incorrect, check |
|---|---|---|
| Small normal pressure loss | Jockey pump starts | Sensing line, controller, start setting |
| Pressure restored | Jockey pump stops | Stop setting, curve, leakage |
| Demand exceeds jockey capacity | Pressure continues to fall | Jockey size and test demand |
| Main start threshold reached | Main fire pump starts | Controller and sensing path |
| Main pump running | System follows approved stop logic | Controller mode and procedure |
| Frequent jockey cycles | Investigate leakage or control issue | Check valves, system volume, settings |
Use a reliable sensing line
Verify connection location, valve position, drainage, blockage risk, trapped air, and independence from pressure surges or an unrepresentative local point. Treat this as a system condition rather than an isolated component choice. Identify the source of every input, the unit used, the operating condition it represents, and the person responsible for approval. If information is preliminary, mark the assumption and test how the decision changes at a conservative boundary. This prevents a neat calculation from hiding an uncertain water level, pressure, valve position, driver condition, or simultaneous demand.
For jockey pump pressure settings, verify this section against the selected pump curve, the actual site arrangement, manufacturer instructions, and the current requirements accepted by the authority having jurisdiction. Check the installed condition as well as the drawing because pipe routes, elevations, supports, controls, and access often change during construction. Record the result in a form that can be repeated during commissioning and later inspection. Do not change a safety-critical setting or isolate fire protection without the approved impairment and restoration process.
Understand controller behavior

Review automatic start, manual stop or automatic-stop provisions as applicable, timer functions, alarms, and what happens after power restoration. The most useful evidence is measured or approved project data, not a copied rule of thumb. Identify the source of every input, the unit used, the operating condition it represents, and the person responsible for approval. If information is preliminary, mark the assumption and test how the decision changes at a conservative boundary. This prevents a neat calculation from hiding an uncertain water level, pressure, valve position, driver condition, or simultaneous demand.
For jockey pump pressure settings, verify this section against the selected pump curve, the actual site arrangement, manufacturer instructions, and the current requirements accepted by the authority having jurisdiction. Check the installed condition as well as the drawing because pipe routes, elevations, supports, controls, and access often change during construction. Record the result in a form that can be repeated during commissioning and later inspection. Do not change a safety-critical setting or isolate fire protection without the approved impairment and restoration process.
Diagnose cycling
Trend start and stop pressure, run time, leakage, check-valve condition, pressure tank where used, and gauge calibration before changing settings. Review this condition at normal, test, and credible abnormal states before procurement. Identify the source of every input, the unit used, the operating condition it represents, and the person responsible for approval. If information is preliminary, mark the assumption and test how the decision changes at a conservative boundary. This prevents a neat calculation from hiding an uncertain water level, pressure, valve position, driver condition, or simultaneous demand.
For jockey pump pressure settings, verify this section against the selected pump curve, the actual site arrangement, manufacturer instructions, and the current requirements accepted by the authority having jurisdiction. Check the installed condition as well as the drawing because pipe routes, elevations, supports, controls, and access often change during construction. Record the result in a form that can be repeated during commissioning and later inspection. Do not change a safety-critical setting or isolate fire protection without the approved impairment and restoration process.
Commission with controlled tests
Lower pressure slowly, record the jockey and main pump actions, verify stop behavior and alarms, then restore the system and secure settings. The design team should turn this point into a traceable calculation or drawing note. Identify the source of every input, the unit used, the operating condition it represents, and the person responsible for approval. If information is preliminary, mark the assumption and test how the decision changes at a conservative boundary. This prevents a neat calculation from hiding an uncertain water level, pressure, valve position, driver condition, or simultaneous demand.
For jockey pump pressure settings, verify this section against the selected pump curve, the actual site arrangement, manufacturer instructions, and the current requirements accepted by the authority having jurisdiction. Check the installed condition as well as the drawing because pipe routes, elevations, supports, controls, and access often change during construction. Record the result in a form that can be repeated during commissioning and later inspection. Do not change a safety-critical setting or isolate fire protection without the approved impairment and restoration process.
Как это связано с оборудованием BORRAPUMP
BORRAPUMP поставляет насосное оборудование для проектов водоснабжения и пожаротушения. Ознакомьтесь с соответствующим Конфигурация продукта BORRAPUMP в качестве отправной точки, затем предоставьте требуемый расход, напор, источник воды, привод, мощность, средства управления, условия площадки, применимые требования, количество и пункт назначения. Окончательный выбор должен основываться на гидравлическом обосновании проекта и утвержденной проектной документации; данное руководство не утверждает, что одна каталожная компоновка подходит для любой юрисдикции или уровня риска.
Похожие руководства BORRAPUMP
- выбор комплекта пожарного насоса
- Руководство по приемочным испытаниям NFPA 20
- Руководство по инспекции и испытаниям NFPA 25
Авторитетные источники
Следующие источники определяют границы стандартов, контекст пожарной безопасности и принципы работы насосных систем, используемые в данном руководстве. Всегда применяйте редакцию и местные нормы, принятые для данного проекта.
- Страница разработки стандарта NFPA 25
- Страница разработки стандарта NFPA 20
- Ресурсы по насосным системам Министерства энергетики США
Обучающее видео
Образовательный бэкграунд от Practical Engineering: Создают ли насосы давление или поток?. Видео поддерживает базовую инженерную концепцию и не заменяет проектно-специфические требования пожарной безопасности.
Часто задаваемые вопросы
What is the correct jockey pump pressure setting?
Use the project-specific approved sequence; no universal pressure value fits every system.
Should the jockey pump stop automatically?
Follow the listed controller and applicable project requirements. Main and jockey pump stop logic may differ.
Why does the main fire pump start before the jockey pump?
Check sensing lines, controller settings, source pressure changes, and whether the devices measure the same representative system point.
Can I widen the pressure gap to stop cycling?
Only after diagnosing leakage, check valves, system volume, pump curve, and applicable setting limits.
Контрольный список финальной проверки
Перед утверждением подтвердите гидравлическое обоснование, состояние источника воды, выбранную характеристику насоса, данные привода и контроллера, номинальные давления компонентов, компоновку арматуры, метод испытаний, доступ, дренаж, аварийную сигнализацию и процедуру восстановления. Устраните расхождения между чертежами и смонтированной системой. Во время пусконаладочных работ используйте откалиброванные приборы и фиксируйте давление на входе, давление на выходе, расход, частоту вращения, состояние привода, сигналы тревоги и отклонения в каждой требуемой точке. Храните принятые результаты вместе с документацией насосной станции, чтобы при последующих проверках можно было сопоставлять сопоставимые данные.